Projects Undertaken

STEEL INDUSTRY
40 KVA, 11kV, Synchronous Condenser (Qatar)
Remove, repair and refit solid steel upshaft leads. Manufacture and fit silver plated connection pins. Reinstall excitor rotor and stator, align using Laser Alignment Equipment. Test and commission.

ALUMINUM INDUSTRY
2,813 KVA, 11kV, Brush (UAE)
Major overhaul of stator, DLA testing.

CEMENT INDUSTRY
2,500 KW, 6600 Volts, BBC Induction Motor (Oman)
Complete overhaul including balancing of rotor and site balancing.

2x4,394 KVA, 13.8 kV Alternators (Saudi Arabia)
Complete rewind using preformed coils and winding kits.

INDUSTRIAL
185 kW, 160/440 Volts, BBC DC Motor (UAE)
Complete overhaul including rewind of rotor and dynamic balancing.

1085 kW, 160/440 Volts, BBC DC Motor (UAE)
Complete overhaul.

POWER GENERATION
5,330 KVA, 11kV, Asea
Rewind 2 x rotors to class 'C' insulation.
Testing included overspend and balancing complete assembly and commissioning on site using Laser Alignment Equipment. The above work carried out to the approval of Ewbank International Consultants & Robin Davies.

42 MVA, 10.5 kV, Elin Union (UAE)
Remove, reinsulated and refit end bells.
Complete assembly and commissioning including Onsite balancing.

78 MW, 11.5 kV, Ansaldo (UAE)
Complete stator rewind on site.

3,125 KVA, 11Kv, Brush Generator (Oman)
Complete stator rewind using preformed coils.


CHEMICAL INDUSTRY
1,420 HP, 3.3 Kv, Parsons Peebles (Qatar)
Site repairs on flashover at connection end of stator.

200 Kw, 6600 Volts, Loher Motor (Oman)
Complete overhaul including rewind of stator using preformed coils manufactured to ISO 9001/AS 3901.

OIL & GAS
1,050 KVA, 600 / 380 Volts, France Transfo (Saudi Arabia)
Dismantle transformer, rewind 3 x coils, asemble.

1000 KVA, General Electric, 600/480 Volts (Oman)
Complete overhaul of dry type transformer.

2,500 KVA, ABB (Dubai)
Complete overhaul of 10 transformers housed in container. Work included inspection, secondary injection of relays, primary injection of circuit breakers, drain oil, test oil and refill.

350 HP, 3.3 Kv, Continental Electric (Qatar)
Rewind stator (flame proof) to upgrade from 350 HP to 400 HP. Included boring out stator frame, installing additional stator laminations press and secure.

2500 KW, 11 Kv, G E C (Abu Dhabi)
Overhaul of 4 motors in accordance with ABS IV specification.

1,500 KVA, 600 Volts, Caterpillar SR4 Alternator (Sudan)
Complete rewind of stator and rotor including dynamic balancing.

2,000 KVA, 2400/4160 Volts, Kato Generator (Yemen)
Complete overhaul.

750 KVA, General Electric AC Generator (Oman)
Complete overhaul including stator rewind.

1,000 KVA, Bemac Generator (Algeria)
Complete overhaul including rewind of 6 pole rotor.

2x480 Kw, 6000 Volts, Siemens Motors (Fujairah)
Complete overhaul including balancing.