Projects
Undertaken
STEEL
INDUSTRY
40
KVA, 11kV, Synchronous Condenser (Qatar)
Remove, repair and refit solid steel upshaft leads. Manufacture and fit
silver plated connection pins. Reinstall excitor rotor and stator, align
using Laser Alignment Equipment. Test and commission.
ALUMINUM
INDUSTRY
2,813
KVA, 11kV, Brush (UAE)
Major overhaul of stator, DLA testing.
CEMENT
INDUSTRY
2,500
KW, 6600 Volts, BBC Induction Motor (Oman)
Complete overhaul including balancing of rotor and site balancing.
2x4,394 KVA, 13.8 kV Alternators (Saudi Arabia)
Complete rewind using preformed coils and winding kits.
INDUSTRIAL
185
kW, 160/440 Volts, BBC DC Motor (UAE)
Complete overhaul including rewind of rotor and dynamic balancing.
1085 kW, 160/440 Volts, BBC DC Motor (UAE)
Complete overhaul.
POWER
GENERATION
5,330
KVA, 11kV, Asea
Rewind 2 x rotors to class 'C' insulation.
Testing included overspend and balancing complete assembly and commissioning
on site using Laser Alignment Equipment. The above work carried out to
the approval of Ewbank International Consultants & Robin Davies.
42 MVA, 10.5 kV, Elin Union (UAE)
Remove, reinsulated and refit end bells.
Complete assembly and commissioning including Onsite balancing.
78 MW, 11.5 kV, Ansaldo (UAE)
Complete stator rewind on site.
3,125 KVA, 11Kv, Brush Generator (Oman)
Complete stator rewind using preformed coils.
CHEMICAL
INDUSTRY
1,420
HP, 3.3 Kv, Parsons Peebles (Qatar)
Site repairs on flashover at connection end of stator.
200 Kw, 6600 Volts, Loher Motor (Oman)
Complete overhaul including rewind of stator using preformed coils
manufactured to ISO 9001/AS 3901.
OIL
& GAS
1,050
KVA, 600 / 380 Volts, France Transfo (Saudi Arabia)
Dismantle transformer, rewind 3 x coils, asemble.
1000 KVA, General Electric, 600/480 Volts (Oman)
Complete overhaul of dry type transformer.
2,500 KVA, ABB (Dubai)
Complete overhaul of 10 transformers housed in container. Work included
inspection, secondary injection of relays, primary injection of circuit
breakers, drain oil, test oil and refill.
350 HP, 3.3 Kv, Continental Electric (Qatar)
Rewind stator (flame proof) to upgrade from 350 HP to 400 HP. Included
boring out stator frame, installing additional stator laminations press
and secure.
2500 KW, 11 Kv, G E C (Abu Dhabi)
Overhaul of 4 motors in accordance with ABS IV specification.
1,500 KVA, 600 Volts, Caterpillar SR4 Alternator (Sudan)
Complete rewind of stator and rotor including dynamic balancing.
2,000 KVA, 2400/4160 Volts, Kato Generator (Yemen)
Complete overhaul.
750 KVA, General Electric AC Generator (Oman)
Complete overhaul including stator rewind.
1,000 KVA, Bemac Generator (Algeria)
Complete overhaul including rewind of 6 pole rotor.
2x480 Kw, 6000 Volts, Siemens Motors (Fujairah)
Complete overhaul including balancing.
|